Projects
Engineering Projects Showcase
Explore our structural case studies mapping high-capacity thermal engineering and deployment.
Nexus Tower Infotech Park
Physical Location
Vijay Nagar, Indore
Scale / Capacity
120 Tonnage Load Capacity
Systems Deployed
360° Cassette UI + Slim Concealed Ducting
Execution Timeline
20 Operational Days
Technical Summary Briefing
Managed high-density heat dissipation from server zones using continuous airflow loops. Configured automated zoning controls to regulate individual office templates dynamically, optimizing indoor air quality while reducing energy drafts by 18%.
Shrinath Manufacturing Industries
Physical Location
Sanwer Industrial Area, Indore
Scale / Capacity
180 Tonnage Load Capacity
Systems Deployed
Multi-Zone VRF System + GI Ducting Layouts
Execution Timeline
30 Operational Days
Technical Summary Briefing
Addressed intense ambient manufacturing heat challenges by implementing computed CFM airflow routing loops. Integrated automated safety interlocking distribution modules with multi-point sensor configurations. Post-commissioning electrical audits confirmed a substantial reduction in power consumption metrics.
CareMax Super Speciality Hospital
Physical Location
Bhawarkua Main Road, Indore
Scale / Capacity
90 Tonnage Load Capacity
Systems Deployed
Cleanroom Class 10k AHU + HEPA Filtration Grid
Execution Timeline
25 Operational Days
Technical Summary Briefing
Deployed critical negative pressure environments for modular operation theaters. Computed strict 25 air changes per hour (ACH) using high-efficiency laminar flow ceiling grids, ensuring zero particulate contamination and precise relative humidity metrics.
Regional Administrative Secretariat Complex
Physical Location
Collectorate Campus, Indore
Scale / Capacity
250 Tonnage Load Capacity
Systems Deployed
Central Chilled Water System + GI Spiral Ducting
Execution Timeline
45 Operational Days
Technical Summary Briefing
Engineered a heavy-duty central cooling architecture for high-ceiling public halls. Integrated primary-secondary pumping distributions and vibration isolators to eliminate structure-borne noise. Audited post-commissioning metrics showed 100% compliance with eco-friendly governmental parameters.
Nexus Tower Infotech Park
Physical Location
Vijay Nagar, Indore
Scale / Capacity
120 Tonnage Load Capacity
Systems Deployed
360° Cassette UI + Slim Concealed Ducting
Execution Timeline
20 Operational Days
Technical Summary Briefing
Managed high-density heat dissipation from server zones using continuous airflow loops. Configured automated zoning controls to regulate individual office templates dynamically, optimizing indoor air quality while reducing energy drafts by 18%.
Shrinath Manufacturing Industries
Physical Location
Sanwer Industrial Area, Indore
Scale / Capacity
180 Tonnage Load Capacity
Systems Deployed
Multi-Zone VRF System + GI Ducting Layouts
Execution Timeline
30 Operational Days
Technical Summary Briefing
Addressed intense ambient manufacturing heat challenges by implementing computed CFM airflow routing loops. Integrated automated safety interlocking distribution modules with multi-point sensor configurations. Post-commissioning electrical audits confirmed a substantial reduction in power consumption metrics.
CareMax Super Speciality Hospital
Physical Location
Bhawarkua Main Road, Indore
Scale / Capacity
90 Tonnage Load Capacity
Systems Deployed
Cleanroom Class 10k AHU + HEPA Filtration Grid
Execution Timeline
25 Operational Days
Technical Summary Briefing
Deployed critical negative pressure environments for modular operation theaters. Computed strict 25 air changes per hour (ACH) using high-efficiency laminar flow ceiling grids, ensuring zero particulate contamination and precise relative humidity metrics.
Regional Administrative Secretariat Complex
Physical Location
Collectorate Campus, Indore
Scale / Capacity
250 Tonnage Load Capacity
Systems Deployed
Central Chilled Water System + GI Spiral Ducting
Execution Timeline
45 Operational Days
Technical Summary Briefing
Engineered a heavy-duty central cooling architecture for high-ceiling public halls. Integrated primary-secondary pumping distributions and vibration isolators to eliminate structure-borne noise. Audited post-commissioning metrics showed 100% compliance with eco-friendly governmental parameters.